The challenge
The biggest challenge is time. ROBE operates in a turbulent global market where it can only maintain its leading position through constant innovation. New products must be ready in time for key trade fairs, and any delay is unacceptable. And all of this without the slightest compromise on visual quality.
Proposed solution
For ROBE, we fine-tuned an accelerated process for manufacturing moulds from high-strength aluminium. This option combines speed, cost-effectiveness and outstanding surface quality — exactly what cosmetic parts and tight deadlines demand.
Execution
We can complete the entire project in 3 to 4 weeks. We always follow four steps that flow seamlessly into one another. We start with a manufacturability (DFM) analysis of the part design, followed by the design of a manufacturable mould. This is followed by precision CNC machining of aluminium alloys (faster material removal than with steel saves us precious days). We then test the mould on our moulding machines, set the injection parameters and finally mould the production run, with an emphasis on thorough final inspection.